Lateral resolution to be achieved (low, medium, and high)
Site photo (Google)
We usually require about one week of preparation time before survey crews can head to the site. Draft results (1D profile or 2D cross section) are available at the end of each day's survey. The final full report is made available within 1-3 weeks after field operation, depending on the size of the survey.
*Arranged and operated by Fromm Applied Technology and K.D. Jones Instruments Corp. (contacts: Art Fromm and Nate Steinbrecher) **Executed by Park Seismic LLC (contact: Choon Park)